Site Quality ManagementConcrete Pavement QA/QC Checklist
Use these inspection areas to structure site quality checks
for DLC and PQC. Apply the test frequencies and acceptance
criteria specified in the contract and approved ITP/QAP.
- Approval of subgrade and underlying pavement layer
- Survey control, line, level and crossfall
- Approved DLC/PQC mix design and trial mixes
- Calibration of batching and weighing systems
- Aggregate moisture correction and water control
- Concrete consistency and fresh-concrete checks
- Transportation, delivery and placing time records
- Layer or slab thickness verification
- Paver operation, vibration and finishing checks
- Surface texture and regularity inspection
- Joint layout, dowel/tie-bar details where specified
- Timely saw cutting and joint sealing where required
- Curing method, duration and protection of concrete
- Specified compressive or flexural strength tests
- Inspection requests, test reports and pour records
- Non-conformance records and corrective actions
Engineering note:
Follow the applicable MoRTH specifications, approved project
drawings, contract requirements, approved mix design, ITP/QAP
and Engineer's instructions. Do not assume universal values
for concrete strength, slump, thickness, curing duration,
joint-cutting time or testing frequency; confirm the
governing requirements for the specific project.