ToggleAfter completion of pier or abutment shaft casting, centerlines in both longitudinal and transverse directions shall be marked on the top surface of the pier shaft for fixing of reinforcement and formwork for pier/abutment cap.
Formwork shall be fabricated and erected in accordance with approved drawings and specifications.
Concrete of approved grade shall be produced at batching plant using approved mix design.
De-shuttering shall be carried out only after the concrete attains required strength.
Concrete curing shall commence immediately after de-shuttering.
The quantity and capacity of equipment shall be decided by the site team based on project requirements and construction schedule.