Granular Sub-Base (GSB) Construction, QC, Tests & Calculations – MoRTH 401

GSB Construction Method – MORTH 401 Guide with Material, CBR & QA (2026)

MoRTH Reference: Section 400 – Clause 401 (5th Revision)
Role: Structural foundation layer for flexible pavements

πŸ›£οΈ GSB Layer Construction Flow Chart

Site Clearance & Preparation
↓
Subgrade Preparation & Approval
↓
Setting Out & Level Marking
↓
Material Approval (GSB)
↓
Spreading of GSB Material
↓
Water Sprinkling
↓
Compaction by Roller
↓
Field Density Test (FDT)
↓
Level & Thickness Check
↓
Rectification (if required)
↓
Final Approval of GSB Layer

1. Scope of Granular Sub-Base

Granular Sub-Base (GSB) is the foundation of durable highways. This guide provides complete MORTH 401 specifications, material selection, gradation limits, CBR & compaction criteria, layer thickness, and QA procedures. Perfect for site engineers and QA/QC teams, it ensures stable pavements, accurate construction, and long-lasting performance.

2. Materials & Physical Requirements

  • Crushed stone, gravel, moorum, sand or approved combinations
  • Free from organic matter, clay lumps, and deleterious materials

3. Equipment

  • Front Loader
  • Tipper Trucks
  • Motor Grader
  • Water Tanker
  • Vibratory Roller (8–10 Ton)
  • Auto Level / Total Station

4. Tools & Tackles

  • Hammer
  • Crowbar
  • Spade
  • Line Rope
  • Pegs
  • Lime Powder
  • Measuring Tape

5. Manpower & Responsibilities

  • Construction Manager
  • Engineer / Supervisor
  • Land Surveyor
  • Material Engineer
  • Safety Supervisor
  • Helpers

Construction Manager

Responsible for overall planning, execution, and resource management. Ensures compliance with safety and quality requirements, conducts coordination with the Project Manager and Consultant Engineer, and ensures all tests and records are maintained as per contract.

Engineer / Supervisor

Responsible for execution of work as per drawings and specifications. Ensures deployment of resources, maintains quality standards, enforces safety practices, and coordinates with consultant staff for approvals.

Land Surveyor

Responsible for establishing reference points, alignment, and level control. Records levels before and after compaction and assists in joint inspections with consultant staff.

Material Engineer

Implements QA/QC procedures, ensures materials meet specification requirements, conducts laboratory and field tests, and maintains all quality records.

Safety Supervisor

Ensures all activities are carried out safely as per approved project safety plan and monitors compliance with EHS requirements.

6. Materials

  • Crushed stone / crushed gravel or combination of materials
  • Material shall conform to MoRTH specifications
  • 10% Fines Value β‰₯ 50 kN (soaked condition)
  • Material shall meet required grading (Table 400-1)
All materials shall be tested and approved before use in the work.
PropertyRequirement
CBR (Soaked)β‰₯ 30%
Aggregate Impact Value≀ 40%
Liquid Limit≀ 25%
Plasticity Index≀ 6%

7. GSB Gradation Requirements (MoRTH Table 400-1)

SieveGr-1Gr-2Gr-3Gr-4Gr-5Gr-6
75 mm100-100-100-
53 mm80–100100-10080–100100
26.5 mm55–9070–10055–7550–8055–9075–100
4.75 mm25–5540–6510–3015–3525–5030–55
0.075 mm<5<5<5<5-0–3

8. Detailed Construction Procedure

  • Preparation of Subgrade: GSB shall be laid only after approval of the prepared subgrade layer in accordance with Clause 305. The surface shall be clean, free from loose material, and properly compacted to specified density. Any soft spots or irregularities shall be rectified before commencement.
  • Setting Out: Toe lines, centerline, and levels shall be marked using pegs, string line, and lime powder. Alignment, width, and levels shall be verified and approved prior to laying.
  • Material Placement: Calculated quantity of approved GSB material shall be transported and deposited uniformly over the prepared surface. Care shall be taken to avoid segregation during unloading and handling.
  • Spreading of Material: Material shall be spread in uniform layers using a motor grader to the required loose thickness. Any segregation observed shall be corrected immediately by mixing using grader blade.
  • Quality Check – Pre-Compaction: Gradation of material shall be checked at QC laboratory before laying. Visual inspection shall ensure uniformity of mix and absence of oversized or segregated particles.
  • Moisture Conditioning: Water shall be sprinkled uniformly using water tanker to achieve Optimum Moisture Content (OMC). Moisture content shall be maintained within +1% to -2% of OMC for effective compaction.
  • Final Grading: The layer shall be graded carefully to achieve required camber, cross slope, and longitudinal profile. Surface shall be smooth, even, and free from segregation.
  • Compaction: Compaction shall be carried out using a vibratory roller of 8–10 ton capacity. Rolling shall start from the lower edge and progress towards the upper edge for cambered sections.
  • Rolling Pattern: Rolling shall be carried out longitudinally with each pass overlapping at least one-third of the roller drum width to ensure uniform compaction.
  • Trial Stretch: A trial stretch shall be executed to determine the optimum number of passes, roller type, and moisture content required to achieve specified density.
  • Correction During Rolling: All depressions, high spots, and segregated areas shall be identified and corrected during initial rolling itself by adding/removing material and re-compacting.
  • Camber & Level Check: Camber, cross slope, and levels shall be checked using auto level/total station and corrected before final rolling.
  • Final Rolling: A final smooth (static) pass shall be applied over the entire stretch to achieve uniform surface finish.
  • Rolling Speed Control: Speed of roller shall be maintained uniform and shall not exceed 5 km/hr to ensure proper compaction.
  • Field Density Testing: After completion of compaction, field density tests shall be conducted using sand replacement method or nuclear gauge to verify degree of compaction.
  • Level Recording: Finished levels shall be checked and recorded. Any deviation beyond permissible limits shall be corrected before proceeding to next layer.
  • Approval: The completed GSB layer shall be inspected jointly with the Engineer/Consultant and approved before laying subsequent pavement layers.
Note: No subsequent layer shall be laid without approval of the finished GSB layer.

9. Acceptance Criteria

QA/QC Table - GSB

QA/QC TABLE – GRANULAR SUB BASE (GSB)

πŸ”· Inspection at Source

Test / ParameterStandardFrequencyAcceptance Criteria
GradationIS: 2720 (Part 4)1 Test / 400 mΒ³As per MoRTH Table 400-1 (5th Revision)
Atterberg LimitsIS: 2720 (Part 5)1 Test / 400 mΒ³Max 25%
CBR (4 days soaked)IS: 2720 (Part 16)As & when requiredMin 30% at 98% of MDD
Modified ProctorIS: 2720 (Part 8)Every MonthUsed for MDD & OMC determination
Water AbsorptionIS: 2386 (Part 3)As & when requiredIf >2%, conduct further durability checks
Soundness TestIS: 2386 (Part 5)As & when requiredMax 12% (Naβ‚‚SOβ‚„), Max 18% (MgSOβ‚„)
Aggregate Impact ValueIS: 2386 (Part 4) / IS: 5640As & when requiredMax 40%
Deleterious ContentIS: 2720 (Part 27)As & when requiredSodium sulphate ≀ 0.5%, Organic matter ≀ 1.0%

πŸ”· In-Process Inspection

Test / ParameterStandardFrequencyAcceptance Criteria
Moisture ContentIS: 2720 (Part 2)Each & every pit-2% to +1% of OMC
Field Density (Sand Replacement)IS: 2720 (Part 28)0–1000 mΒ² = 1 test (03 pits)As per specification
Field Density (Nuclear Method)AASHTO T 3100–1000 mΒ² = 2 testsAs per specification

πŸ”· Acceptance Criteria

ParameterRequirement
Compaction ControlEach & every layer
Relative DensityAs per MoRTH Specification Clause 903.3.1
Finished Level ToleranceAs per project specification
Routine testing shall be carried out as per Clause 900 of MoRTH Specifications.

11. Inspection Plan & Testing

S.NoActivityInspection RequiredTests RequiredRemarks
1Approval of Subgrade Top LayerYesYesField density test and levels jointly recorded
2Spreading / Fill LayersYesNoMethod control
3Final LayerYesYesJoint survey and record
4Dumping AreaYes---Top soil disposal at instructed locations
5Density ChecksYesYesAfter completion of compaction
GSB ITP (Inspection & Test Plan) with Hold & Witness Points | MoRTH 401 Highway QA/QC

Inspection & Test Plan (ITP) for GSB Works

Granular Sub-Base (GSB) – Hold & Witness Points as per MoRTH 401 / IRC Standards

Scope: This ITP covers material approval, subgrade preparation, spreading, compaction, testing, and final acceptance of Granular Sub-Base (GSB) layer in highway construction projects.

1. Material Approval & Testing

ActivityInspection RequirementReferenceResponsibilityType
Source approval of GSB materialQuarry / borrow area approvalMoRTH 401EngineerH
Gradation testCompliance with Table 400-1IS 2386QA/QCH
Atterberg limitsPlasticity Index checkMoRTH SpecsQA/QCH
CBR testMinimum strength requirementIRC 37QA/QCH
Stockpile inspectionClean and segregated materialQA PlanEngineerW

2. Subgrade Preparation

ActivityInspection RequirementReferenceResponsibilityType
Subgrade compaction checkAchieved required densityMoRTH 300EngineerH
Proof rollingNo deformation or ruttingIRC GuidelinesEngineerW
RFI clearanceApproval before GSB layingQA SystemEngineerH

3. Spreading of GSB Material

ActivityInspection RequirementReferenceResponsibilityType
Layer thickness checkAs per design drawingsGFC DrawingsEngineerH
Moisture contentWithin OMC rangeIS 2720QA/QCW
Uniform spreadingNo segregationMoRTH 401EngineerW

4. Compaction Works

ActivityInspection RequirementReferenceResponsibilityType
Rolling sequence approvalVibratory + static rollingQA PlanEngineerH
Field density test (FDT)β‰₯ 98% MDDIS 2720 (Part 28)QA/QCH
Moisture adjustmentWater control before rollingSpecsEngineerW

5. Final Inspection & Acceptance

ActivityInspection RequirementReferenceResponsibilityType
Surface finish checkUniform and compact layerMoRTH 401EngineerH
Level verificationTolerance complianceGFC DrawingsEngineerH
Approval for next layerClearance for WMM / DLCQA SystemEngineerH
Key References: MoRTH Section 401, IRC 37, IS 2720, IS 2386
Purpose: Quality control of Granular Sub-Base layer in highway pavement construction.

12. Safety Measures

  • All safety measures shall be followed as per approved EHS Plan.
  • Personal Protective Equipment (PPE) is mandatory.
  • Proper traffic management shall be ensured at site.
  • All equipment shall be inspected before operation.
  • Safe working practices shall be maintained at all times.
  • Field Dry Density shall be β‰₯ 98% of Maximum Dry Density (MDD).
  • Surface level tolerance shall be +10 mm / -20 mm.
  • Top width shall be within +25 mm of the specified drawing.
All works shall comply with MoRTH specifications and approved drawings.

13. Test Calculations

Field Density Calculation (Example)

  • Weight of excavated soil = 3.80 kg
  • Volume of hole = 0.0024 mΒ³
  • MDD = 1.95 g/cc

Bulk Density = 1.58 g/cc

πŸš€ QA/QC Toolkit β‚Ή299
Buy Now

Degree of Compaction = 81% (Rejected)

14. Surface Finish & Tolerances

ItemTolerance
Longitudinal LevelΒ±20 mm
Cross SlopeΒ±0.3%
Surface Evenness≀12 mm (3 m straight edge)
Layer Thickness≀200 mm

15. Engineer’s Inspection Checklist

  • βœ” Approved material source
  • βœ” Gradation within limits
  • βœ” Moisture within OMC range
  • βœ” 98% MDD achieved
  • βœ” Surface tolerances verified

16. Conclusion

Proper gradation, moisture control, compaction, and systematic quality control testing are essential for a durable Granular Sub-Base. Compliance with MoRTH 401 ensures long-term pavement performance and structural stability.

Frequently Asked Questions (FAQ)

1. What is the purpose of GSB in highway construction?

Granular Sub-Base (GSB) provides load distribution, drainage, and a stable foundation between the subgrade and base layers. It improves pavement performance and increases the overall lifespan of the highway.

2. What are the gradation limits for GSB as per MORTH 401?

Gradation limits are defined in MORTH Clause 401 with sieve-wise percentage passing requirements from 75 mm down to 0.075 mm. Proper gradation ensures strength, stability, and adequate drainage.

3. What compaction and CBR criteria should be met for GSB?

GSB must typically achieve a minimum of 98% of Modified Proctor Maximum Dry Density (MDD), and the soaked CBR value should generally be β‰₯ 30% as per project specifications.

4. Can I use this guide for site inspections?

Yes. This guide is structured for field engineers and QA/QC professionals, making it suitable for practical site inspections and compliance verification.

5. Is this content updated for 2026 standards?

Yes. The information reflects current MORTH specifications and updated quality control practices relevant for 2026 highway projects.